Field fix / guideRegisters & TemplatesVendor-agnosticRegisters & Templatesindustrial-automation

Cable Schedule Template

Shared by TSIMEREZIVO Team · 4 Oct 2026 · 45 views

# Cable Schedule Template One row per cable run — multicores and pairs. Drives procurement, pulling, and termination. | Field | Description | Example | |---|---|---| | Cable Number | Unique ID | C-1001 | | From | Origin | JB-BL-02 | | To | Destination | PLC Panel P-01 TB1 | | Cable Type | Spec | 12PR x 1.5mm² IS/OS SWA | | Cores / Pairs | Conductor count | 12 pairs | | Screen | Individual/overall | IS+OS | | Length (m) | Route length + 10% spare | 85 | | Route | Tray/conduit reference | T-2 / TRAY-B | | Signals Carried | Tags on this cable | FT-101, LT-102, PT-103 | | Armour | SWA/SWA-STA/none | SWA | | Gland | Gland type/size | M20 Exd | | Drum No | Procurement ref | DR-07 | | Status | Pull status | Pulled / Terminated / Tested | | Remarks | Notes | Spare pairs P11, P12 | ## Usage notes - Segregate instrument (IS) and non-IS cables on separate trays per IEC 60079. - Add 10% to measured route lengths before ordering. - Mark spare pairs at both ends — future instruments will thank you. - Test insulation resistance on every core before energising.

More like this

Rate, comment, and get full access

Members can download files, rate contributions, and discuss fixes with the engineers who posted them — free.

Join the library