Field fix / guideCommissioning ProcedureVendor-agnosticCommissioningindustrial-automation

Loop Check Record Sheet

Shared by TSIMEREZIVO Team · 4 Oct 2026 · 51 views

# Loop Check Record Template Loop No: ______________ Sheet: __ of __ Instrument(s): ______________ System: ______________ Checked by: ______________ Witnessed by: ______________ Date: ____ ## Analog input loop | Test point | Injected | SCADA display | Pass/Fail | |---|---|---|---| | 0% (4.00 mA) | | | | | 25% (8.00 mA) | | | | | 50% (12.00 mA) | | | | | 75% (16.00 mA) | | | | | 100% (20.00 mA) | | | | | Upscale burnout (>21 mA) | | fault state shown? | | | Downscale burnout (<3.6 mA) | | fault state shown? | | ## Analog output loop | Commanded | Measured at terminals | Field device response | Pass/Fail | |---|---|---|---| | 0% | | | | | 50% | | | | | 100% | | | | ## Digital signals | Test | Expected | Result | Pass/Fail | |---|---|---|---| | DI: field contact open/close | correct tag state | | | | DO: force output | field device actuates | | | ## Completion checks - [ ] Tag, range, and units on HMI match the datasheet - [ ] Alarm limits functional at this loop's setpoints - [ ] Trend capture verified on HMI/historian - [ ] Cable identification correct at both ends - [ ] Remarks: ______________________________________________ Loop PASSED / FAILED — re-test after punch item closed.

More like this

Rate, comment, and get full access

Members can download files, rate contributions, and discuss fixes with the engineers who posted them — free.

Join the library