# BMS Template: Lighting Automation Control
## 1. Overview
**Purpose:**
Intelligent building lighting control integrating occupancy detection, daylight harvesting, scene management, and DALI bus control. Covers on/off scheduling, dimming, emergency lighting testing, and ASHRAE 90.1 compliance monitoring.
**Industry Standards:**
- ASHRAE 90.1-2019 (Lighting Power Density limits — W/m²)
- IEC 62386 (Digital Addressable Lighting Interface — DALI)
- DALI-2 (IEC 62386 Part 101/102/103 — updated device profile)
- EN 1838 (Lighting for Emergency Lighting Systems)
- NFPA 101 (Life Safety Code — Emergency egress lighting)
- BS 5839 / EN 54 (Fire detection integration — switch off non-emergency lighting)
- LEED v4 (Indoor Environmental Quality — EQ Credit: Enhanced Lighting Control)
**Critical Constraints:**
- **Emergency lighting:** CANNOT be switched off by BMS under any circumstances — hardwired to maintained circuit
- **Fire alarm override:** All non-emergency lighting switches ON automatically when fire alarm activates (full illumination for evacuation)
- **Minimum maintained illuminance:** 500 lux at task plane (offices per ISO 8995-1), 300 lux (corridors), 200 lux (stairwells)
- **Occupancy timeout:** Maximum 30 min OFF delay after last motion detection (some codes require ≤ 20 min)
- **Daylight harvesting:** Dimming level must not reduce maintained illuminance below task minimum
- **DALI short circuit:** BMS must detect DALI bus faults and maintain last-known state
- **Emergency test:** Automatic monthly 1-minute duration test; 3-hour annual discharge test (EN 1838)
- **LPD (Lighting Power Density):** Log actual vs ASHRAE 90.1 LPD limits for compliance
**Relevant Physics:**
- Illuminance: **E = Φ / A** [lux = lm/m²] (Φ = luminous flux)
- Daylight factor: **DF = E_indoor / E_outdoor × 100%** (cloudy sky reference)
- Dimming: For LED drivers, output luminous flux is approximately linear with dimming signal 0–100%
- Emergency battery duration: **t = C_battery / I_load** (minimum 3 hours per EN 1838)
- Daylight autonomy: % of occupied hours where daylight alone meets task illuminance target
---
## 2. Control Philosophy
```
Lighting Zones and Priority:
Zone Type | Control Mode | Min Lux | Timeout
─────────────────|─────────────────────────────|─────────|────────
Open plan office | Occupancy + Daylight harvest | 500 | 20 min
Meeting room | Scene + Occupancy | 300 | 15 min
Corridor/Lobby | Occupancy (dim to 20%) | 100 | 30 min
Stairwell | Occupancy (dim to 30%) | 100 | 30 min
External | Photocell schedule | 30 | Sunrise
Carpark | Occupancy (dim to 10%) | 75 | 30 min
Emergency | Maintained (always ON) | 10 | Never
Scene Management:
Scene 1 — Full (100%): Presentations, cleaning, maintenance
Scene 2 — Daywork (70%): Normal occupied hours, balanced comfort
Scene 3 — Meetings (50%): Presentation room, mixed daylight
Scene 4 — Dawn/Dusk (30%): Early/late occupancy
Scene 5 — Security (10%): Unoccupied security monitoring
DALI Bus Architecture:
BMS Controller → DALI Gateway → DALI Bus → Ballasts/LED Drivers
Each bus supports 64 DALI addresses × N groups
Groups 1–16 map to lighting zones
Broadcast commands for fire alarm response
```
---
## 3. Control Logic
```pascal
{ === INTELLIGENT LIGHTING AUTOMATION === }
{ DALI-2 / ASHRAE 90.1 / EN 1838 compliant lighting BMS }
PROGRAM Lighting_Control
CONSTANTS
OCC_TIMEOUT_OFFICE_S = 1200 { s — 20 min occupancy timeout (office) }
OCC_TIMEOUT_CORR_S = 1800 { s — 30 min (corridors) }
OCC_TIMEOUT_MEET_S = 900 { s — 15 min (meeting rooms) }
DAYLIGHT_HARVEST_MIN = 5.0 { % — minimum dim level during harvesting }
TASK_LUX_OFFICE = 500 { lux — ISO 8995 office minimum }
TASK_LUX_CORRIDOR = 100 { lux — corridor minimum }
TASK_LUX_EMERGENCY = 10 { lux — EN 1838 emergency minimum }
PHOTOCELL_ON_LUX = 200 { lux — outdoor level to switch on ext lights }
PHOTOCELL_OFF_LUX = 500 { lux — outdoor level to switch off ext lights }
MONTHLY_TEST_DAY = 1 { Day of month for automatic emergency test }
MONTHLY_TEST_DUR_S = 60 { s — monthly 1-min emergency test }
ANNUAL_TEST_DUR_S = 10800 { s — annual 3-h emergency discharge test }
FIRE_OVERRIDE_LVL = 100.0 { % — full ON during fire alarm }
VARIABLES
{ Inputs — DALI feedback and sensors }
zone_office_occ : BOOL { Occupancy sensor — office zone }
zone_corr_occ : BOOL { Occupancy sensor — corridor }
zone_meet_occ : BOOL { Occupancy sensor — meeting room }
photo_cell_lux : REAL { lux — exterior photocell }
daylight_lux_z1 : REAL { lux — daylight sensor zone 1 (office) }
fire_alarm_active : BOOL { TRUE when building fire alarm active }
emrg_batt_ok : BOOL { Emergency battery healthy }
dali_bus_fault : BOOL { DALI bus communication fault }
day_of_month : INT { 1–31 from RTC }
time_of_day_s : INT { seconds since midnight }
annual_test_cmd : BOOL { Manual trigger for annual test }
{ Outputs — DALI dimming levels (0–100%) }
dali_zone_office_pct : REAL { % dim — office zone }
dali_zone_corr_pct : REAL { % dim — corridor zone }
dali_zone_meet_pct : REAL { % dim — meeting room }
dali_zone_ext_cmd : BOOL { ON/OFF — exterior lighting }
dali_emrg_test_cmd : BOOL { Emergency test activation }
alarm_dali_fault : BOOL
alarm_emrg_batt_fail : BOOL
alarm_monthly_test_due: BOOL
alarm_lux_low : BOOL
{ Internals }
occ_timer_office : TOF { OFF delay timer — office }
occ_timer_corr : TOF { OFF delay timer — corridor }
occ_timer_meet : TOF { OFF delay timer — meeting }
emrg_test_timer : TON { Emergency test duration timer }
emrg_test_active : BOOL
harvest_correction_pct: REAL { % reduction from daylight harvesting }
scheduled_on : BOOL { Time-of-day schedule }
base_office_pct : REAL { % before harvest correction }
monthly_test_done : BOOL { Track monthly test completed }
BEGIN
{ === FIRE ALARM OVERRIDE — HIGHEST PRIORITY === }
IF fire_alarm_active THEN
dali_zone_office_pct := FIRE_OVERRIDE_LVL
dali_zone_corr_pct := FIRE_OVERRIDE_LVL
dali_zone_meet_pct := FIRE_OVERRIDE_LVL
{ Emergency maintained circuits are hardwired — not controlled here }
RETURN { Skip all other logic }
END_IF
{ --- DALI Bus Fault --- }
alarm_dali_fault := dali_bus_fault
alarm_emrg_batt_fail := NOT emrg_batt_ok
{ --- Time Schedule (08:00–19:00 weekdays) --- }
{ In production: use BACnet schedule objects or RTC with calendar }
scheduled_on := time_of_day_s >= 28800 AND time_of_day_s <= 68400 { 08:00–19:00 }
{ === EMERGENCY LIGHTING TEST === }
IF day_of_month = MONTHLY_TEST_DAY AND NOT monthly_test_done THEN
alarm_monthly_test_due := TRUE
emrg_test_timer(IN := TRUE, PT := T#60s)
dali_emrg_test_cmd := TRUE
IF emrg_test_timer.Q THEN
dali_emrg_test_cmd := FALSE
monthly_test_done := TRUE
alarm_monthly_test_due := FALSE
END_IF
ELSIF day_of_month <> MONTHLY_TEST_DAY THEN
monthly_test_done := FALSE { Reset for next month }
END_IF
IF annual_test_cmd THEN
emrg_test_timer(IN := TRUE, PT := T#10800s)
dali_emrg_test_cmd := TRUE
IF emrg_test_timer.Q THEN
dali_emrg_test_cmd := FALSE
END_IF
END_IF
{ === OFFICE ZONE — Occupancy + Daylight Harvesting === }
occ_timer_office(IN := zone_office_occ, PT := T#1200s)
IF zone_office_occ OR occ_timer_office.Q THEN
{ Occupancy active (or within timeout) — calculate dim level }
{ Daylight harvesting: reduce artificial light proportional to daylight }
IF daylight_lux_z1 > 200.0 THEN
{ Harvest: reduce to keep total near 500 lux setpoint }
harvest_correction_pct := MIN(90.0, (daylight_lux_z1 / TASK_LUX_OFFICE) * 70.0)
ELSE
harvest_correction_pct := 0.0
END_IF
base_office_pct := 100.0 - harvest_correction_pct
base_office_pct := MAX(DAYLIGHT_HARVEST_MIN, base_office_pct)
dali_zone_office_pct := base_office_pct
{ Lux verification alarm }
alarm_lux_low := daylight_lux_z1 + (base_office_pct / 100.0 * 600.0) < TASK_LUX_OFFICE * 0.8
ELSE
{ Unoccupied: dim to 0% (off) — corridors may stay at low level for safety }
dali_zone_office_pct := 0.0
END_IF
{ === CORRIDOR ZONE — Occupancy with Background Dim === }
occ_timer_corr(IN := zone_corr_occ, PT := T#1800s)
IF zone_corr_occ THEN
dali_zone_corr_pct := 70.0 { Full functional light }
ELSIF occ_timer_corr.Q OR scheduled_on THEN
dali_zone_corr_pct := 20.0 { Background dim — safety lighting }
ELSE
dali_zone_corr_pct := 10.0 { Night minimum — security }
END_IF
{ === MEETING ROOM ZONE — Scene-Based + Occupancy === }
occ_timer_meet(IN := zone_meet_occ, PT := T#900s)
IF zone_meet_occ THEN
dali_zone_meet_pct := 80.0 { Daywork scene }
ELSIF occ_timer_meet.Q THEN
dali_zone_meet_pct := 0.0 { Off after timeout }
END_IF
{ === EXTERIOR LIGHTING — Photocell Control === }
IF photo_cell_lux < PHOTOCELL_ON_LUX THEN
dali_zone_ext_cmd := TRUE { Dusk — switch on }
ELSIF photo_cell_lux > PHOTOCELL_OFF_LUX THEN
dali_zone_ext_cmd := FALSE { Dawn — switch off }
END_IF
{ Hysteresis prevents rapid switching at dusk/dawn }
END_PROGRAM
```
---
## 4. Tag List (ISA-5.1 / BACnet Naming)
| Tag Name | BACnet Type | Description | EGU | Notes |
|---|---|---|---|---|
| `LT_Z01_OCC` | BI | Office zone occupancy | — | PIR sensor |
| `LT_Z02_OCC` | BI | Corridor occupancy | — | PIR sensor |
| `LT_Z03_OCC` | BI | Meeting room occupancy | — | PIR sensor |
| `LT_EXT_PHOTO_PV` | AI | Exterior photocell | lux | Calibrated |
| `LT_Z01_DL_PV` | AI | Office daylight sensor | lux | Near window |
| `LT_FIRE_ALARM` | BI | Fire alarm input | — | From FA panel |
| `LT_EMRG_BATT_OK` | BI | Emergency battery health | — | — |
| `LT_DALI_BUS_FAULT` | BI | DALI bus fault | — | — |
| `LT_Z01_DIM_CV` | AO | Office zone dim level | % | DALI ARC 0–254 |
| `LT_Z02_DIM_CV` | AO | Corridor dim level | % | — |
| `LT_Z03_DIM_CV` | AO | Meeting room dim level | % | — |
| `LT_EXT_CMD` | BO | Exterior lights on/off | — | — |
| `LT_EMRG_TEST_CMD` | BO | Emergency test trigger | — | Requires confirm |
| `LT_MONTHLY_TEST_DUE` | BV | Monthly test alarm | — | — |
---
## 5. Alarm Configuration
| Alarm | Priority | Condition | Action |
|---|---|---|---|
| `LT_FIRE_LT_ON_ALM` | Critical | Fire alarm → all zones 100% | Evacuation illumination |
| `LT_EMRG_BATT_ALM` | Critical | Battery health failed | Inspect & replace; log test date |
| `LT_DALI_FAULT_ALM` | High | DALI bus fault | Maintain last state; maintenance |
| `LT_LUX_LOW_ALM` | Medium | Task lux < 80% target | Check dimming, clean luminaires |
| `LT_MONTHLY_TEST_ALM` | Low | Monthly test due / not run | Schedule test; log result |
---
## 6. ASHRAE 90.1 LPD Compliance Tracking
| Space Type | ASHRAE 90.1 LPD Limit | Installed LPD | Status |
|---|---|---|---|
| Open Office | 1.1 W/m² | ≤1.0 W/m² | Compliant |
| Conference Room | 1.3 W/m² | ≤1.1 W/m² | Compliant |
| Corridor / Transition | 0.7 W/m² | ≤0.5 W/m² | Compliant |
| Parking Garage — Interior | 0.15 W/m² | ≤0.12 W/m² | Compliant |
| Exterior — Grounds | 0.09 W/m² | — | Per design |
*LPD = Watts of installed connected load / floor area. Must be re-verified after any fixture changes.*
---
## 7. Commissioning Checklist
- [ ] Verify emergency maintained circuits are hardwired (test with BMS controller powered off)
- [ ] Test fire alarm override: activate fire panel test mode; confirm all zones reach 100%
- [ ] Calibrate photocell: verify switching at design lux thresholds (ON ≤200, OFF ≥500 lux)
- [ ] Calibrate daylight sensors: compare reading to handheld lux meter (±15% tolerance)
- [ ] Test occupancy sensor coverage — no dark corners in zone; no false triggers from HVAC
- [ ] Verify DALI addressing: confirm each luminaire responds to its address only
- [ ] Run monthly emergency test: confirm 60 s duration and result logged
- [ ] Verify LPD calculation matches installed fixture schedule
- [ ] Conduct darkness sweep at 02:00: confirm all non-emergency lights at designed night level
- [ ] Log baseline energy consumption (lighting sub-meter daily kWh at 100% scene for benchmarking)