Engineering Library
Procedures, PLC and HMI code, drawings, and field-proven fixes shared by working controls and instrumentation engineers. Community contributions publish immediately and can be flagged for review. Membership is free — sign in to download, rate, and contribute.
126 published contributions
- Read more
Chemical Disinfection & Residual Monitoring — Control Design
Automatically inject chlorine or ozone into treated water to inactivate pathogens bacteria, viruses, protozoa . Maintain residual disinfectant 0.2–0.5 mg/L free chlorine throughout distribution system. Continuously monit…
TSIMEREZIVO Team · 42 views · 0 downloads
- Read more
Deaerator Heater Level Control — Control Design
Maintain the deaerator feed water tank at a constant level typically 50–60% of vessel to ensure reliable suction pressure for the boiler feedwater pump NPSH—Net Positive Suction Head availability . The deaerator also hea…
TSIMEREZIVO Team · 45 views · 0 downloads
- Read more
Water Recycling Circuit & Density Balance — Control Design
Mining operations recycle water from thickener overflow back to upstream processes crusher, mill to conserve water and recover valuable solids from clarified water. However, recycled water carries suspended fines and rea…
TSIMEREZIVO Team · 32 views · 0 downloads
- Read more
Injection Mold Cavity Temperature Control — Control Design
Regulate injection mold cavity temperature via circulating heating/cooling water and proportional control valves. Critical for part dimensional stability, surface quality, and cycle time optimization in injection molding…
TSIMEREZIVO Team · 36 views · 0 downloads
- Read more
Dual Equipment Switchover (Automatic Failover) — Control Design
Switch load automatically from Primary → Secondary motor if Primary fails OR Primary demand exceeds capacity.
TSIMEREZIVO Team · 37 views · 0 downloads
- Read more
Paint Mixing 3 Component — PLC Control Template
Three component paint batching using loadcell based gravimetric dosing and an agitator mix phase. Component ratios must total 100% before the sequence can start.
TSIMEREZIVO Team · 36 views · 0 downloads
Worked on a project? Share what you learned.
Upload procedures, code, drawings — or post the fix that took you a day to find. Your experience is the library.
Create a free account